The process of changing an average 10-way fuse board, including safety testing and certification, typically takes around half a day to a full day. However, before replacing the board, an electrical inspection must be conducted, and an Electrical Installation Condition Report (EICR) must be produced to identify any existing faults or unsafe situations.